150kV/15kV HS cabine Petrol, Antwerpen

noAarchitecten
Antwerp
150kV/15kV HS cabine Petrol, Antwerp

A project by noAarchitects in Antwerp.

Project details

ARCHITECT:
noAarchitecten
CLIENT
Elia Engineering
ENGINEERING OFFICE
stability: BAS bvba
MAIN CONTRACTORS
Cegelec contractor, construction: Wyckaert
SURFACE
2622 m²
VOLUME
8361 m³
TOTAL BUILDING COST
2700 €, excl. BTW
TOTAL BUILDING COST PER M2
1 €, excl. BTW